2020湖南重点招商引资项目双语版来了!基础设施•城市建设篇(下),请查收!

来源:湖南商务 编辑:朱婷劼 2020-06-11 10:55:33
时刻新闻
—分享—

2020湖南重点招商引资项目重镑推出,共497个项目,总投资1.8万亿元。分为基础设施、新型工业化、现代服务业、现代农业四大类。《湖南商务》将分期发布。

The Manual of MajorProjects Open to Foreign Investment of Hunan In 2020, with a total of 497 projects and a total investment of RMB 1.8 trillion, was released grandly. These projects were divided into four categories: infrastructure, new industrialization, modern service industry, and modern agriculture, and “Hunan Business” will present them in different issues.

基础设施•城市建设篇

Infrastructure•Urban Construction

21、株洲枫溪污水处理厂二期及配套管网工程项目

Zhuzhou Fengxi Sewage Treatment Plant Phase II Project and Supporting Pipeline Network

一、项目建设背景

株洲市枫溪污水处理厂位于株洲市芦淞区京广铁路以东、枫溪港以北、湘大路西侧。一期工程处理规模为2.5万m³/d,于2017年建成后投入运行至今。随着城市的发展,污水收纳区域人口日益增长,居民用水量不断的增加,区域污水排放量日益增多,将超出枫溪污水处理厂一期的处理能力。为保证区域水环境免受污染,枫溪污水处理厂二期的建设迫在眉睫。二期计划在原厂内扩建,不新征用地。

二、项目前期工作

目前,已完成初步方案专家评审,待资规局批复。

三、项目建设内容

新建规模为2.5万t/d,配套建设污水管网约12.91km,新建天池污水提升泵站1座,其中污水泵站土建按3.8万t/d,设备按2.5万t/d配置。

四、项目建设投资

工程估算总投资约2.43亿元。

五、项目效益分析

本项目投资回报率7%左右。

六、项目合作方式

合资、合作。

七、项目单位及联系方式

项目单位:市住房和城乡建设局

联系方式:刘建桥13874156921

I. Project Background

Zhuzhou Fengxi Sewage Treatment Plant is located east of Beijing-Guangzhou Railway, north of Fengxigang and west of Xiangda Roadin Lusong District of Zhuzhou City. The Phase I project has been put into operation since its completion in 2017 with a treatment capacity of 25,000 m³/d. With the development of the city, the population of the sewage storage area is growing, the water consumption of residentsand the regional sewage discharge are increasing, which will exceed the treatment capacity of the Phase I Project of Fengxi Wastewater Treatment Plant. In order to protect the regional water environment from pollution, the construction of the Phase II Project is imminent. And in the second phase, the original plant will be expanded without requisitioning land.

II. Preliminary Work

At present, the expert review of the preliminary plan has been completed and is waiting for the approval of the planning bureau.

III. Project Content

The newly-built scale is 25,000 t/d, and the supporting sewage pipe network is about 12.91km. Tianchi Sewage Lifting Pump Station will be built, with civil works capacity of 38,000 t/d and equipment capacity of 25,000 t/d.

IV. Project Investment

The estimated total investment of the project is about RMB 243 million.

V. Benefit Analysis

The return on investment of this project is about 7%.

VI. Cooperation Way

Contractual joint venture/joint venture

VII. Project Initiator and Contact Way

Project Initiator: Housing and Urban-Rural Development Bureau of Zhuzhou City

Liaison: Liu Jianqiao+86-13874156921

22、湘潭兴隆湖片区综合体项目

Complex Development of Xiangtan Xinglong Lake Area

一、项目建设背景

湘潭经开区位于长沙与湘潭融城发展的核心之地,园区总面积138平方公里,现已形成汽车及零部件制造、电子信息、先进装备制造三大主导产业,经济总量稳居全省国家级园区第三位。为推动园区实现由工业集聚园区向产城融合城市功能区的转型,经开区将对标前海合作区、苏州工业园,建设湘潭“兴隆湖滨江新城片区”项目。项目将围绕“两轴三区”的空间格局,增强旅游、文创、商务办公、教育、居住等城市功能,推动由园区向城区的转型。

二、项目前期工作

项目选址于湘潭经开区滨江新城区域内,东至沿江北路,西至潭州大道,南至九昭东路,北至沪昆高铁,总面积约为13668亩,分三期建设。目前正在制定兴隆湖片区整体规划设计,部分土地征拆及报批已完成。

三、项目建设内容

项目重点建设湘江湾金融商务中心、活力运动中心、体育休闲中心,拟引进国际、国内综合性配套服务类的商业优质企业以及国内外金融机构、企业总部基地、结算中心、产业孵化器、高端教育机构等产业,打造现代服务业聚集区、滨水活力运动休闲区、国际城市复合功能区。

四、项目建设投资

项目总投资约500亿元。

六、项目合作方式

可采取合资、独资方式。

七、项目单位及联系方式

项目单位:湘潭经济技术开发区管理委员会

联系方式:刘进 19907320508

邮箱:652514389@qq.com

I. Project Background

Xiangtan Economic and Technological Development Zone (“Xiangtan ETDZ”) is located at the central region for the integrated development of Changsha and Xiangtan. It covers a total area of 138 square kilometers, and has formed three leading industries of automobile and parts manufacturing, electronic information, and advanced equipment manufacturing with the total economic volume ranking third in the province's national zones.In order to promote the transformation of Xiangtan ETDZ from an industrial agglomeration zone to a city-industry-integrated urban functional zone, "Xinglong Lake Binjiang New City Area" in Xiangtan will be constructed with reference to the Qianhai Cooperation Zone and Suzhou Industrial Park. The project will focus on the spatial pattern of "two axes and three zones", enhance urban functions such as tourism, cultural and creative, business office, education, and residence, and promote the transformation from the zone to the urban area.

II. Preliminary Work

The project is located in the Binjiang New City area of Xiangtan EDTZ, with Yanjiang North Road in the east, Tanzhou Avenue in the west, Jiuzhao East Road in the south, and Shanghai-Kunming High-speed Railway in the north. With a total area is about 13,668 mu, the project will be constructed in three phases. The overall planning and design of the Xinglong Lake area is currently under preparation, and part of the land acquisition and demolition and approval have been completed.

III. Project Content

The project focuses on the construction of Xiangjiang Bay Financial Business Center, Vitality Sports Center, and Sports and Leisure Center. The international and domestic commercial quality enterprises in the field of comprehensive supporting service, domestic and overseas financial institutions, corporate headquarters and settlement center, industry incubators, high-end education institutions and other industries will be energetically introduced to build modern service industry gathering area, waterfront vitality sports and leisure area, and international city compound function area.

IV. Project Investment

The investment of the project totals about RMB 50 billion.

VI. Cooperation Way

Sole proprietorship/joint venture

VII. Project Initiator and Contact Way

Project Initiator: Administration Committee of Xiangtan Economic and Technological Development Zone

Liaison: Liu Jin+86-19907320508

E-mail: 652514389@qq.com

23、湘潭天易紫荆湖新城项目

Xiangtan Tianyi Zijing Lake Industrial New City

一、项目建设背景

湘潭天易紫荆湖产业新城位于长株潭城市群半小时经济圈内,处于株洲市和湘潭市城市结合部,“一城际、双高铁”使项目地的辐射效应倍增,是长株潭地区交通的“黄金枢纽点”。

项目选址南起天易大道、北抵湘江、西临向东渠、东至芙蓉大道,园区内金融、教育、医疗、交通等配套设施完善,常住人口约20万人。项目所在地拥有湘江水、向东渠、金霞山、龙兴寺、白沙洲、紫荆湖等得天独厚的自然生态环境,是长株潭湘江风光带上的“宝石生态芯”。

二、项目前期工作

项目范围内给排水、电力、通讯、排污、天然气、道路等配套设施正在同步建设中;项目已完成立项与环评工作。

三、项目建设内容

项目总规划面积约14036亩,拟重点引进文化创意、动漫设计、休闲娱乐、总部经济等新兴服务产业,形成以文化为核心,旅游为平台,科技为手段,产业为支撑的生态新城。

四、项目建设投资

项目总投资200亿元。

五、项目效益分析

投资方参与项目区域内的一、二级土地开发,并自持不少于50%的核心物业运营,在物业销售和运营收入方面获得回报。

六、项目合作方式

独资、合资、合作。

七、项目单位及联系方式

项目单位:湘潭天易经开区管委会

联系方式:吴哲 0731-57575799  13975298557

邮箱:147952665@qq.com(吴)

地址:湖南省湘潭天易大道8号创业大厦

I. Project Background

Xiangtan Tianyi Zijing Lake Industrial New City is located in the half-hour economic circle of the Changsha-Zhuzhou-Xiangtan City Cluster, at the junction of Zhuzhou City and Xiangtan City."One intercity railway, double high-speed railways" double the radiation effect of the project by making it the "golden hub" of transportation in Changsha-Zhuzhou-Xiangtan City Cluster.

The project is close to Tianyi Avenue in the south, Xiangjiang River in the north, Xiangdongqu in the west and Furong Avenue in the east. The finance, education, medical care, transportation and other supporting facilities are complete, with a resident population of about 200,000. The project siteenjoys unique natural ecological environment such as Xiangjiang River, Xiangdongqu, Jinxia Mountain, Longxing Temple, Baishazhou, Zijing Lake, etc. It is the "gem ecological core" on the Xiangjiang River Scenic Belt of Changsha, Zhuzhou and Xiangtan.

II. Preliminary Work

Supporting facilities such as water supply and drainage, electricity, communication, sewage disposal, natural gas, roads, etc. within the scope of the project are under construction; the project approval and environmental impact assessment have been completed.

III. Project Content

The total planned area of the project is about 14036 mu. The emphasis is laid on the introduction of new service industries such as cultural creativity, animation design, leisure and entertainment, and headquarters economy to form an ecological new city with culture as the core, tourism as the platform, technology as the means, and industry as the support.

IV. Project Investment

The investment totals RMB 20 billion.

V. Benefit Analysis

The investor participates in the development of the first and second tiers of land in the project area, and owns no less than 50% of the core properties to obtain returns in terms of property sales and operating income.

VI. Cooperation Way

Sole proprietorship/contractual joint venture/joint venture

VII. Project Initiator and Contact Way

Project Initiator: Administration Committee of Xiangtan Tianyi Economic Development Zone

Liaison: Wu Zhe+86-0731-57575799 +86-13975298557

E-mail: 147952665@qq.com

Address: Venture Building, No.8 Tianyi Avenue, Xiangtan City, Hunan Province

24、湘潭万楼城市休闲综合体项目

Wanlou Urban Leisure Complex Project in Xiangtan City

一、项目建设背景

万楼又名文昌阁、文起楼,始建于明朝万历四十三年,400余年间屡废屡建,先后5次重修,是湘潭的标志性建筑之一,是湘潭历史文化的见证。

项目依托临江生态景观资源、独一无二的生态环境优势、便捷的交通优势、深厚的人文历史资源优势,以产、城、人高度融合的建设理念,实现居住、文创与旅游三位一体融合发展,承载湘潭改善城市面貌带动城市升级的重任。

二、项目前期工作

已完成土地征拆等相关前期工作。

三、项目建设内容

主要建设万楼景区、湘潭文创中心、万楼景区湘潭日月城、智能文化旅游总部基地、旅游文化码头等,重点引进文化旅游休闲产业,加速带动河西滨江文化休闲经济带的形成和发展。

四、项目建设投资

项目总投资40亿元。

五、项目效益分析

项目主要收入来源于产权物业销售收入、商务办公和商业场地租赁收入、商业活动收入、会展收入、旅游收入、物业服务收入等。

六、项目合作方式

合资、合作,引进社会资本投资。

七、项目单位及联系方式

项目单位:湘潭城乡建设发展集团

联系方式:胡恒飞 15898532488

I. Project Background

Wanlou, also known as Wenchangge and Wenqilou, was built in the 43rdyear of the Wanli Period in the Ming Dynasty. It was destroyed and built repeatedly over 400 years and has been rebuilt five times.

Relying on the ecological landscape resources of neighbouring river, unique ecological environment advantages, convenient transportation advantages, and profound humanities and historical resources advantages, and taking the construction concept of high integration of industry, city and people, the project aims to realize the integrated development of residence, cultural creativity and tourism. It undertakes the task of improving the appearance and driving the upgrading of Xiangtan City.

II. Preliminary Work

The relevant preliminary work such as land acquisition and demolition has been completed.

III. Project Content

Main items to be constructed include Wanlou Scenic Spot, Xiangtan Cultural and Creative Center, Wanlou Scenic Spot Xiangtan Riyue City, Intelligent Cultural Tourism Headquarters Base, Tourism Cultural Pier, etc. with the focus on introducing cultural tourism and leisure industries to accelerate the formation and development of the Hexi Riverside Cultural and Leisure Economic Belt.

IV. Project Investment

The investment of the project totals RMB 4 billion.

V. Benefit Analysis

The main benefits come from the income of property rights and property sales, income of business office and commercial venue leasing, business activity income, exhibition income, tourism income, property service income, etc.

VI. Cooperation Way

Contractual joint venture, joint venture, introduction of social capital

VII. Project Initiator and Contact Way

Project Initiator: Xiangtan Urban & Rural Construction Development Group

Liaison: Hu Hengfei +86-15898532488

25、湘潭滨江芙蓉新城项目

Xiangtan Riverside Furong New City Project

一、项目建设背景

项目地处芙蓉大道与北二环路相交处,是湘潭市的政治中心和重要工业区。项目周边岳塘经开区实验学校、滴水社区幼儿园、荷塘中学等教育资源众多,湘江风光带,盘龙大观园等景观资源丰富。项目周边目前商业配套缺乏,拟通过地块开发,完善商业配套,激发经济活力。

二、项目前期工作

项目位于岳塘区荷塘乡滴水村,北临湘江风光带,南临芙蓉大道,东临四桥东引线,西临板六路。目前已完成征拆工作,具备土地挂牌上市条件。

三、项目建设内容

项目总用地面积483.97亩,可出让净用地面积为426.25亩,设计涵盖“购物公园商业MALL”、“特色商业街”、“精品酒店”、“高端住宅”、“配套中小学”、“绿地公园”等产业。

四、项目建设投资

项目总投资约14亿元。

五、项目效益分析

项目的经营收入主要为土地出让金、根据合作占股所获得的土地二级开发销售利润、自持经营性资产和租赁收入。

六、项目合作方式

合资、合作。

七、项目单位及联系方式

项目单位:湘潭地产集团经营有限公司

联系方式:李建光 13762227777

I. Project Background

Located at the intersection of Furong Avenue and North Second Ring Road, the project is the political center and important industrial zone of Xiangtan City. There are abundant educational resources such as Yuetang Economic Development Zone Experimental School, Dishui Community Kindergarten, Hetang Middle School, etc., and rich landscape resources represented by the Xiangjiang Scenic Belt and Paragon Grand Garden, in surrounding areas. The area is currently lack of commercial facilities. It is planned to develop the land to improve the commercial facilities and stimulate economic vitality.

II. Preliminary Work

The project is located in Dishui Village, Hetang Township, Yuetang District, with the Xiangjiang River Scenic Belt in the north, Furong Avenue in the south, the east lead of the Fourth Bridge in the east, and Banliu Road in the west. At present, the land acquisition and demolition work has been completed, and the conditions for listing the land are met.

III. Project Content

The total land area of the project is 483.97 mu, and the net land area for sale is 426.25 mu. The design covers "shopping park commercial mall", "characteristic commercial street", "boutique hotel", "high-end residence", "supporting primary and secondary schools", "greenland park "and other industries.

IV. Project Investment

The total investment is about RMB 1.4 billion.

V. Benefit Analysis

The operating income of the project is mainly the land transfer fee, the secondary development and sales profits of the land obtained based on joint stock partnership, the self-held operating assets and the rental income.

VI. Cooperation Way

Contractual joint venture/joint venture

VII. Project Initiator and Contact Way

Project Initiator: Xiangtan Real Estate Group Management Co., Ltd.

Liaison: Li Jianguang+86-13762227777

26、郴州北湖区机场空港新城项目

Airport New Town in Beihu District, Chenzhou City

一、项目建设背景

郴州北湖机场位于北湖区华塘镇塔水村,定位为国内旅游支线机场,按4C标准规划建设,拟开通郴州至北京、上海、成都、深圳、张家界、昆明、西安、南宁、福州等地的航线,预计到2030年,旅客年吞吐量达41万人次。在新北湖原有的配套设施上,第四中学、第十一完小、通用小学、郴州师范等教育资源不断丰富,第三人民医院北院也落户新北湖片区。南侧生态资源优越的小埠·南岭生态城负氧离子含量达20000个cm3,区域绿地率超80%,项目区综合了旅游、航空物流、商贸金融等产业,已成为郴州市的“绿色名片”和“花园客厅”。

二、项目前期工作

北湖机场空港新城专项规划已完成,现在正在建设航道工程及航站楼。

三、项目建设内容

项目拟建设以航空为主的空港新城,包含临空产业、食品加工的航空产业园与飞行器俱乐部、展示销售中心。

四、项目建设投资

项目总投资100亿元。

五、项目效益分析

利用空港新城优势环境孵化项目,并转产创造效益。

六、项目合作方式

独资。

七、项目单位及联系方式

项目单位:郴州市北湖区商务局

联系方式:唐亚军 17773510171

I. Project Background

Chenzhou Beihu Airport is located in Tashui Village, Huatang Town, Beihu District. It is positioned as a feederairportfor domestic tourism. It is planned and constructed according to 4C standards. Routes from Chenzhou to Beijing, Shanghai, Chengdu, Shenzhen, Zhangjiajie, Kunming, Xi'an, Nanning, Fuzhou and other placesare going to be opened.It is estimated that by 2030, the annual passenger throughput will reach 410,000. Based on the original supporting facilities of Beihu District, the Fourth Middle School, the Eleventh Primary School, the General PrimarySchool, Chenzhou Normal University and other educational resources are constantly enriched, and the North Hospital of the Third People's Hospital is also located in the new Beihu area. The Xiaobu · Nanling Eco-city with superior ecological resources in the south has a negative oxygen ion content of 20,000 cm3and a regional green space rate of over 80%. The project integrates tourism, aviation logistics, trade, finance and other industries, and has become the"greenbusiness card "and"garden living room "of Chenzhou.

II. Preliminary Work

The special planning of Beihu Airport New City has been completed, and the navigation engineering and terminal building are now under construction.

III. Project Content and Scale

An airport new town with aviation as the core will be constructed, including airport industry, food processing, aircraft club, aircraft display and sales center.

IV. Project Investment

The total investment: RMB10 billion.

V. Benefit Analysis

Taking advantage of the superior environment in airport new town for the incubation of projects and changing the line of production to create benefits.

VI. Cooperation Way

Sole proprietorship

VII. Project Initiator and Contact Way

Project Initiator: Bureau of Commerce of Beihu District, Chenzhou City

Liaison: Tang Yajun +86-17773510171

27、郴州宜章县新城区开发项目

New Urban Area Development Project of Yizhang County, Chenzhou

一、项目建设背景

近年来,随着宜章县城市建设的不断推进,县城常住人口逐年递增,新城区建设是推动宜章县更快发展的必然选择。新城区规划范围总用地面积505公顷,其中城市建设用地165.43公顷,定位为集合行政办公、金融贸易、文化娱乐等多功能为一体的现代城市中心。老城区与新城区衔接地段的玉溪河上游段综合治理、蒋家湾市场、尚书广场、麦子桥、民主西路(一期)、骑玥广场等城市公共服务设施已建成使用,广慈医院、县交通安全管理服务中心等项目接近完工。

二、项目前期工作

已成立宜章县新城区建设领导小组办公室。已编制完成宜章县总体规划(2012-2030年)、新城区(核心区)控制性详细规划、老城区(核心区)控制性详细规划。已完成汽车总站选址、拆迁、民主西路三期雨污水排放等前期工作。

三、项目建设内容

项目主要进行民主西路三期改造工程、汽车总站、新城区规划范围内7条主次干道、文化创意园、香堂岭郊野公园、移动大楼等项目建设。

四、项目建设投资

项目建设投资50亿元。

五、项目效益分析

改善宜章县城人居环境,促进城市发展。

六、项目合作方式

合资、合作。

七、项目单位及联系方式

项目单位:宜章县住房和城乡规划建设局

联系方式:陈国群 13873587999

I. Project Background

In recent years, with the continuous advancement of the urban construction of Yizhang County, the permanent population of the county has increased year by year, and the construction of new urban areas is an inevitable choice to promote the faster development of Yizhang County. The planned area of the new urban area is 505 hectares, including 165.43 hectares of land for urban construction use. The project is positioned as a modern urban center that integrates administrative office, finance and trade, cultural entertainment and other functions. Urban public service facilities such as the comprehensive management of the upper reaches of the Yuxi River, Jiangjiawan Market, Shangshu Square, Maizi Bridge, West Minzhu Road (Phase 1), Qiyue Square, etc., which connect the old and new urban areas, have been completed and put into use. Guangci Hospital, the county traffic safety management service center and other projects are nearing completion.

II. Preliminary Work

The Leading Group Office for the Construction of New Urban Area of Yizhang County has been established. TheMaster Plan of Yizhang County (2012-2030), the regulatory detailed plan of new urban area (core area) and the regulatory detailed plan of old urban area (core area) have been completed. The preliminary works such as the location selection of the bus terminal, demolition, and the rainwater and sewage discharge of the third phase of Minzhu West Road have been completed.

III. Project Content

Main components: the third-phase reconstruction project of Minxi West Road, the bus terminal, 7 primary and secondary arterial roads within the scope of the planned new urban area, cultural and creative park, Xiangtangling Country Park, China Mobile building, etc.

IV. Project Investment

The construction investment of the project amounts to RMB 5 billion.

V. Benefit Analysis

It will improve the human settlement environment in Yizhang County and promote urban development.

VI. Cooperation Way

Contractual joint venture/joint venture

VII. Project Initiator and Contact Way

Project Initiator: Housing and Urban-Rural Planning and Construction Bureau of Yizhang County

Liaison: Chen Guoqun +86-13873587999

28、岳阳芭蕉湖城市综合体项目

Yueyang Bajiao Lake Urban Complex Project

一、项目建设背景

岳阳是全国唯一拥有6个国家级开放平台的地级市,是区域性中心城市,湖南省“一极四区”城市,综合经济实力位居中部六省大中城市前列。城陵矶新港区共有注册企业1000多家,人口13万人,项目具备开发建设的经济基础和市场容纳力。项目致力打造集滨湖休闲、艺术展示、生态体验、商业购物等功能为一体的生态文化核心,建成体现岳阳深厚人文底蕴的标志性经典城市建筑。

二、项目前期工作

项目选址符合总体规划,建设区域交通运输便利,工程地质条件好,水、电、汽等能源供应有保障。

三、项目建设内容

项目占地约70万平方米,主要建设商业综合体、星级度假酒店、大型海洋主题公园、室内自然展览馆及空中娱乐园等,打造集购物、旅游、艺术、娱乐、餐饮等功能为一体的文化旅游中心。

四、项目建设投资

总投资50亿元。

五、项目效益分析

项目建成投产后,预计年交易额50亿元,年利润达8亿元,新增就业岗位6000个,新增税收1亿元。

六、项目合作方式

独资、合资、合作及其它等。

七、项目单位及联系方式

项目单位:湖南城陵矶新港区

联系方式:成诗韵 13975019988

I. Project Background

Yueyang is the only prefecture-level city in the country with 6 national-level open platforms. It is a regional central city and a city of "one pole, four districts" in Hunan Province. There are more than 1,000 registered enterprises in Chenglingji New Port Area with a population of 130,000. The project has the economic foundation and market capacity for development and construction. The project is dedicated to creating an ecological and cultural core that integrates functions such as lakeside leisure, art display, ecological experience, and commercial shopping, and builds iconic classicbuildings that reflect Yueyang's profound cultural heritage.

II. Preliminary Work

The site selection conforms to the overall plan, and the construction area enjoys convenient transportation, good engineering geological conditions, and guaranteed supply of energy sources such as water, electricity, and natural gas.

III. Project Content

The project covers an area of about 700,000 square meters. Main items like commercial complex, star-rated resort hotel, large-scale marine theme park, indoor nature exhibition hall and aerial entertainment parks, etc. are going to be constructed to create a cultural tourism center integrating shopping, tourism, art, entertainment, catering and other functions.

IV. Project Investment

Total investment: RMB 5 billion.

V. Benefit Analysis

After the project is completed and put into production, the annual transaction volume is expected to be RMB 5 billion, the annual profit will reach RMB 800 million, 6,000 new jobs will be created, and the tax will be RMB 100 million.

VI. Cooperation Way

Sole proprietorship, contractual joint venture, joint venture, etc.

VII. Project Initiator and Contact Way

Project Initiator: Hunan Chenglingji New Port Area

Liaison: Cheng Shiyun +86-13975019988

29、临湘城市综合体项目

Linxiang Urban Complex Project

一、项目建设背景

临湘市地处湖南省东北边陲,长江中下游南岸,素称“湘北门户”。市域总面积1760平方公里,辖10镇、4街道,161个村(居委会),总人口约54万。临湘区位独特,交通便捷,南距长沙、北离武汉各约150公里,是长株潭城市群和武汉城市圈的中心节点,离岳阳市三荷机场仅20公里,已列入国家区域中心城市和大城市岳阳“1+4+2”城市圈。

二、项目前期工作

项目已在棚户区改造中储备了一批商住用地,规划编制已完成。

三、项目建设内容

项目规划用地约700亩,其中麦坡西路棚改地块约200亩,建新北路棚改地块117亩,五里变电站地块101亩,主要建设商业综合体、金融中心、五星级酒店、商业及高端住宅等。

四、项目建设投资

项目总投资约30亿元。

五、项目效益分析

项目建成投产后预计可产生各种收益约40亿元。

六、项目合作方式

独资、合资、合作及其它等。

七、项目单位及联系方式

项目单位:岳阳惠临公司

联系方式:刘伟旭 15274033333 黎钧 13707401215

I. Project Background

Linxiang City is located in the northeastern border of Hunan Province, on the south bank of the middle and lower reaches of the Yangtze River, and is known as the "Gateway of Northern Hunan". The city has a total area of 1,760 square kilometers and a total population of about 540,000, and it governs 10 towns, 4 sub-districts, 161 villages (neighborhood committees). Linxiang has a unique location and convenient transportation. It is about 150 kilometers away from Changsha in the south, 150 kilometers away from Wuhan in the north, and only 20 kilometers from the Sanhe Airport in Yueyang City. It is the central node of the Changsha-Zhuzhou-Xiangtan City Cluster and Wuhan Metropolitan Area. It has been listed as a national regional center and incorporated into the "1 + 4 + 2" cities circle of Yueyang.

II. Preliminary Work

A batch of commercial and residential land obtained from the shantytown reconstruction has been reserved, and the planning has been prepared.

III. Project Content

The total planned land area is about 700 mu, of which, 200 mu for shantytown reconstruction of Maipo West Road, 117 mu for shantytown reconstruction of Jianxin North Road, and 101 mu for Wuli Substation. Main items to be constructed include commercial complex, financial center, and five-star hotel. commerce and high-end residence, etc..

IV. Project Investment

Total investment: about RMB 3 billion.

V. Benefit Analysis

After the project is completed and put into production, it is expected to generate various profits of about RMB 4 billion.

VI. Cooperation Way

Sole proprietorship, contractual joint venture, joint venture, etc.

VII. Project Initiator and Contact Way

Project Initiator: Yueyang Huilin Corporation

Liaisons: Liu Weixu+86-15274033333

Li Jun+86-13707401215

30、津市津港新城商业综合体

Jingang New City Commercial Complex in Jinshi City

一、项目建设背景

津澧新城是湖南省的西北门户,临近中部的长株潭城市群和武汉城市群,是环洞庭湖城市群以及我国沿江经济带的重要组成部分,占据承东启西的战略位置,与岳阳同被列为湖南省融入长江经济带的两大门户节点城市,是湖南省面向长江开放开发的前沿阵地。津市常住人口约3万,生活、商业配套设施完善,交通运输便捷,境内有二广高速、安慈高速、 石岳铁路、常荆铁路、207国道穿过,距离常德市区65公里,长沙197公里。

二、项目前期工作

已完成项目可研报告编制、立项、规划选址,配套设施完善。

三、项目建设内容

项目规划用地2000亩,主要新建津港公园、办公、餐饮、娱乐等商业综合体及配套基础设施,打造成津市商业地标。

四、项目建设投资

总投资50亿元。

五、项目效益分析

项目建成后,可提供约1000个以上就业岗位,商业投入运营后,年商业经营收入约10亿元左右。

六、项目合作方式

独资或合资。

七、项目单位及联系方式

项目单位:津市市招商促进事务中心

联系方式:李晓明 13511154227

I. Project Background

Jinli New City is the northwest gateway of Hunan Province. It is close to the Chang-Zhu-Tan City Custer and Wuhan City Group. It is an important component of the Dongting Lake City Group and the economic zone along Yangtze River in China. It is listed, together with Yueyang, as the two major gateway nodes in Hunan Province's integration into the Yangtze River Economic Belt, and is the forefront of Hunan Province's opening up to the Yangtze River. Jinshi City has a permanent population of about 30,000. It is equipped with complete living and commercial facilities and convenient transportation. It has Erenhot-Guangzhou Expressway, Anxiang-Cili Expressway, Shimen-Yueyang Railway, Changde-Jingmen Railway, and G207. It is 65 kilometers away from the urban area of Changdeand 197 kilometers away from Changsha.

II. Preliminary Work

The feasibility study report preparation, project approval, and site selection have been completed, and the supporting facilities are complete.

III. Project Content

With a planned land area of 2,000 mu, commercial complex integrating Jingang Park, office, foo&beverage and entertainment, and supporting infrastructuresare going to be constructed to create a commercial landmark of Jinshi City.

IV. Project Investment

Total investment: RMB 5 billion.

V. Benefit Analysis

After the project is completed, it can provide more than 1,000 jobs. After the business is put into operation, the annual business income will be about RMB 1 billion.

VI. Cooperation Way

Sole proprietorship or joint venture

VII. Project Initiator and Contact Way

Project Initiator: Investment Promotion Affairs Center of Jinshi City

Liaison: Li Xiaoming +86-13511154227

31、常德桥南工业园搬迁项目

Changde Qiaonan Industrial Park Relocation Project

一、项目建设背景

桥南工业园位于常德江南城区阳明湖板块东侧,孔家融路以南、善卷路以西、报国路以北,大湖路以东,占地总面积约1646亩,是常德比较老旧的中小企业工业园区。随着经济的发展,江南城区正在全面落实产业“退二进三”,拟将桥南工业园整体搬迁,大力发展第三产业。

二、项目前期工作

已完成项目区域现状测绘并作出城市设计方案的初稿;已完成项目板块土地现状及征拆评估等前期工作。

三、项目建设内容

规划用地1255亩,其中居住用地约1000亩、商业用地约50亩、教育用地约155亩、医院用地约60亩,着力打造集居住、商业、教育、医疗、会展中心于一体的城市生活新中心。

四、项目建设投资

总投资140亿元。

五、项目效益分析

通过对桥南工业园土地综合开发,提高土地资源配置科学合理性,建设板块内的商业、商居开发及基础设施,投资企业有较大的发展空间。

六、项目合作方式

合作或独资。

七、项目单位及联系方式

项目单位:常德阳明湖投资开发有限公司

联系方式:孙金华 13607367410

I. Project Background

The Qiaonan Industrial Park (a relatively old SME industrial park in Changde), covering a total area of about 1,646 mu, is located on the east side of the Yangming Lake plot in the southern urban area of Changde, south of Kongjiarong Road, west of Shanjuan Road, north of Baoguo Road and east of Dahu Road. With the economic development, Jiangnan District is fully implementing the "Two-Outs and Three-Ins" of the industry, plans to relocate the Qiaonan Industrial Park as a whole, and vigorously develops the tertiary industry.

II. Preliminary Work

The survey and mapping of the current status of the project area has been completed and the first draft of the urban design plan has been made; the preliminary work such as land acquisition and demolition and assessment of land status have been completed.

III. Project Content

The planned land area is 1,255 mu, of which residential land is about 1,000 mu, commercial land is about 50 mu, education land is about 155 mu, and hospital land is about 60 mu. We will strive to create a new urban life center integrating residence, commerce, education, medical treatment, and exhibition center.

IV. Project Investment

Total investment: RMB 1.4 billion.

V. Benefit Analysis

Through comprehensive development of the land in the Qiaonan Industrial Park, the scientific and rational allocation of land resources will be improved, and commercial and commercial-residential development and infrastructure within the construction sector will be built. Investment companies will have more room for development.

VI. Cooperation Way

Sole proprietorship or contractual joint venture

VII. Project Initiator and Contact Way

Project Initiator: Changde Yangming Lake Investment and Development Co., Ltd.

Liaison: Sun Jinhua+86-13607367410

32、常德鼎城区桥南轻纺城地块项目

Qiaonan Light Textile Plot Project of Dingcheng District in Changde

一、项目建设背景

鼎城区作为云贵门户和市辖城区,凭借其独特的历史人文和优越的地理环境、便利的交通网络在泛湘西北有一席之地。项目坐落在沅水一桥南桥头,是桥南商业圈门户,建成后将提升桥南商业圈的品位,优化桥南商业圈从业和消费环境。

二、项目前期工作

目前该市场已依法关闭,原有商户全部搬离。项目在规划认证中。

三、项目建设内容

规划用地37.34亩,拟将本项目打造成为商业功能完善、基础设施配套、产业结构合理的大型商业综合体。

四、项目建设投资

项目总投资20亿元。

五、项目效益分析

项目成熟后,预计年销售额达30亿元,年可上缴税收8000万元以上,解决就业3000人以上。

六、项目合作方式

合作或独资。

七、项目单位及联系方式

项目单位:常德市鼎城区商务局

联系方式:宋德 13467368372

I. Project Background

Dingcheng District, as the gateway to Yunnan and Guizhou and the urban area under the jurisdiction of the city, has its place in the northwestern Hunan area with its unique historical culture, superior geographical environment and convenient transportation network. The project is located at the south bridge head of Yuanshui No. 1 Bridge, which is the gateway of the Qiaonan business circle. Upon completion, it will enhance the taste of Qiaonan business circle and optimize the employment and consumption environment of Qiaonan business circle.

II. Preliminary Work

At present, the market has been closed according to law, and all the original merchants have moved away. The planning and demonstration of the project are underway.

III. Project Content

The planned land area is 37.34 mu. It is planned to build this project into a large-scale commercial complex with complete commercial functions, supporting infrastructure and reasonable industrial structure.

IV. Project Investment

Total investment: RMB 2 billion.

V. Benefit Analysis

After the project is mature, it is estimated that the annual sales will reach RMB 3 billion, the annual tax can be paid over RMB 80 million, and more than 3,000 jobs can be provided.

VI. Cooperation Way

Sole proprietorship or contractual joint venture

VII. Project Initiator and Contact Way

Project Initiator: Bureau of Commerce of Dingcheng District, Changde City

Liaison: Song De+86-13467368372

33、汉寿县高铁新城项目

High-speed Railway New Town Project in Hanshou County

一、项目建设背景

长益常高铁是渝长厦、呼南高铁的重要组成部分,国家东西铁路交通运输主动脉,主要承担城际客流,同时兼顾长途快速客流运输,与黔张常高铁构成川渝地区与湘赣闽等地区间的快速通道。

汉寿南站总投资约20亿元,高铁新城规划面积6.67平方公里,核心区域1.1平方公里。本项目前期开发面积1000亩,选址在汉寿大道两侧,将与县城新城区融合一体。

二、项目前期工作

长益常高铁目前已动工建设,预计2022年建成通车。县人民医院、县公安局、县人民法院、县住房保障服务中心、县烟草局等单位已搬迁至新城区,交通及生活配套设施完善。

三、项目建设内容

项目拟引进有实力、有经验的战略投资者分片整体开发,投资建设星级酒店、商贸文化、电子商务、高档住宅等基础配套设施,打造汉寿城市新地标,充分发挥其强大的城市辐射功能。

四、项目建设投资

项目总投资20亿元。

五、项目效益分析

项目建成后可提供20000个就业岗位,年销售收入70亿元以上,年缴税收3亿元以上。

六、项目合作方式

合资、合作、独资。

七、项目单位及联系方式

项目单位:汉寿县招商促进事务中心

联系方式:唐平恒 13908411616

I. Project Background

Changsha-Yiyang-Changde High-speed Railway is an important part of Chongqing-Changsha-Xiamen High-speed Railway and Hohhot-Nanning High-speed Railway. It is the main artery of the east-west railway transportation in the country. It mainlyundertakes intercity passenger flow, while taking into account the long-distance rapid passenger flow. It forms a fast track between Sichuan and Chongqing area and Hunan, Jiangxi and Fujian area together with the and the Qianjiang--Zhangjaijie-ChangdeHigh-speed Railway.

The total investment of Hanshou South Railway Station is about RMB 2 billion, the planned area of the High-speed Railway New Town is 6.67 square kilometers, and of the core area is 1.1 square kilometers. The area to be developed in the earlier stage is 1,000 mu. The site is located on both sides of Hanshou Avenue, and will be integrated with the new urban area of the county.

II. Preliminary Work

The construction of Changsha-Yiyang-Changde High-speed Railway was launched, and is expected to be completed and open to traffic in 2022. Units such as the County People’s Hospital, the County Public Security Bureau, the County People’s Court, the County Housing Security Service Center, and the County Tobacco Bureau have been relocated to the new urban area, with complete transportation and living facilities.

III. Project Content

Powerful and experienced strategic investors are going to be introduced for overall development. They will invest in the construction of star-rated hotels, business culture, e-commerce, high-end housing and other basic supporting facilities to create a new landmark of Hanshou City, and give full play to its powerful urban radiation function.

IV. Project Investment

Total investment: RMB 2 billion.

V. Benefit Analysis

After the project is completed, it can provide 20,000 jobs, realize an annual sales income of more than RMB 7 billionand an annual tax payment of more than RMB 300 million.

VI. Cooperation Way

Sole proprietorship, contractual joint venture, joint venture

VII. Project Initiator and Contact Way

Project Initiator: Investment Promotion Affairs Center of Hanshou County

Liaison: Tang Pingheng+86-13908411616

34、永州零陵区湘江之春城市综合体

“Spring of Xiangjiang River” Urban Complex of Lingling District in Yongzhou

一、项目建设背景

零陵区现有的商业中心位于旧城中心,其面积规模等都已经无法满足居民日益增长的高品质消费需求。项目位于零陵区南津渡大桥东西两侧,处于潇水河畔,属于中心区域,毗邻零陵古城旅游核心景区和国家级湿地公园,区内风光秀丽,景色优美,商住开发潜力巨大。

二、项目前期工作

已完成了该片区约600亩土地报批、征收,并完成了房屋征收补偿。

三、项目建设内容

项目规划用地1360亩,总建筑面积约300万平方米,主要建设综合写字楼、住宅楼、商业中心、高级酒店、会议中心等,拟打造成零陵重要的“城市商业中心”、“城市客厅”。

四、项目建设投资

项目总投资约60亿元。

五、项目效益分析

项目建成后投资回报率预计30%左右。

六、项目合作方式

独资。

七、项目单位及联系方式

项目单位:永州市零陵城建投资有限公司

联系方式:杨飞 13100223305

I. Project Background

The existing commercial center of Lingling District is located in the center of the old urban area, and its area and scale have been unable to meet the growing consumer demand of residents for high quality. The project is located on the east and west sides of Nanjindu Bridge in Lingling District, on the banks of the Xiaoshui River. It belongs to the central area and is adjacent to the core scenic spot of Lingling Ancient City and the national wetland park. The area has beautiful scenery andhuge potential for commercial and residential development.

II. Preliminary Work

About 600 mu of land in the area have been submitted for approval and expropriated, and compensation for house acquisition has been completed.

III. Project Content

With a planned land area of 1360 mu and a total construction area of about 3 million square meters, main items to be constructed include comprehensive office building, residential building, commercial center, high-end hotel, and conference center, so as to build the project into an important "urban business center" and "urban living room" in Lingling. .

IV. Project Investment

Total investment: about RMB 6 billion.

V. Benefit Analysis

After the project is completed, the return on investment is expected to be around 30%.

VI. Cooperation Way

Sole proprietorship

VII. Project Initiator and Contact Way

Project Initiator: Yongzhou Lingling Urban Construction Investment Co., Ltd.

Liaison: Yang Fei +86-13100223305

35、娄底高铁北片区开发项目

Development of North Area of Loudi High-speed Railway Station

一、项目建设背景

娄底高铁南站于2014年12月16日正式运营,呼南高铁在此与沪昆高铁形成十字型交叉。现站点日经车次120多趟,经停车次90多趟,日平均人流量6000左右,周末及节假日高峰期日人流超过一万。娄底高铁南站距离娄底城区不到四千米,规划为娄底南联创小镇主要承载区。随着区域主要路网通车及高铁综合枢纽的建成,万宝新区管委会正在推进高铁枢纽及附近地块的招商,现已有娄底市移动互联网产业园投入运营,入驻互联网企业及总部企业200余家。

高铁北片区作为万宝新区的核心区和娄底大力发展现代服务业的重要载体,已由法国夏瓦纳设计师事务所完成万宝新城核心区城市设计。

二、项目前期工作

目前已完成区域周边主要路网的建设,娄星南路、新星南路、静安街、万宝大道等主干道已通车,部分地块已完成土地报批和征地拆迁工作。

三、项目建设内容

娄底高铁站北片区地处湖南娄底市万宝新区,毗邻娄底高铁南站,规划范围为万宝大道北、娄星南路东、新星南路西、尖山寨山体以南区域,总用地面积约1200亩,其中住宅用地376亩、商业综合用地222亩、道路用地217亩、教育用地38亩、中心绿轴用地72亩,主题公园及人工湖面积275亩(不计容),综合容积率2.59,商业占比32.7%(建筑面积),按照“统一规划、整体开发、分步实施”的开发理念和思路,总建设周期为5年,主要包括住宅开发、商业、办公、基础设施及配套建设。

商业和办公包括:150m以上超高层地标建筑、五星级酒店、高端特色商业金融街、创新创业中心、人才公寓。

基础设施及配套建设包括:高端国际化小学、幼儿园、娄底南﹒联创小镇文化公园、迎宾路、龙井路、卧龙北路、凤鸣北路、中央景观轴。

四、项目建设投资

总投资50亿元,包含土地成本8亿元,建设、管理及其它成本42亿元。

五、项目合作模式

独资、合资。

六、项目效益分析

通过项目经营、配套服务租售收益等获取丰厚回报。同时可以通过项目内的商住配套开发来平衡该项目的资金需求。

七、项目单位及联系方式

项目单位:娄底水府示范片万宝新区招商发展部

联系方式:易志高 0738-8116018 15907384100

E-mail:wbxqzsb88@vip.163.com

地 址:湖南省娄底市静安街百弘学府城B6栋

I. Project Background

Loudi High-speed Railway South Station was officially opened on December 16, 2014, and Hohhot-Nanning High-speed Railway formed a cross-shaped intersection with Shanghai-Kunming High-speed Railway here. At present, the station has more than 120 trips and more than 90 stops per day. The daily average flow of people is about 6000, and the daily flow of people on weekends and holidays exceeds 10,000. Loudi High-speed Railway South Station is less than four kilometers away from Loudi District and is planned to be the main bearing area of Loudi South Lianchuang Town. With the opening of the main road network in the region and the construction of the high-speed rail comprehensive hub, the Administration Committee of Wanbao New Area is promoting investment in the high-speed railway hub and nearby plots. Now, Loudi Mobile Internet Industrial Park has been put into operation and more than 200 Internet companies and headquarters companies have settled in.

The North Area of Loudi High-speed Railway South Station is the core of Wanbao New Area and the important carrier of Loudi's vigorous development of modern service industry. The urban design of the core area of Wanbao New Area has been completed by AAUPCCHAVANNES & ASSOCIES.

II. Preliminary Work

At present, the construction of the main road network around the area has been completed. The main roads such as Louxing South Road, Xinxing South Road, Jing'an Street and Wanbao Avenue have been opened to traffic. As for some land parcels, the land approval and land acquisition and demolition have been completed.

III. Project Content

The North Area of Loudi High-speed Railway South Station is located in Wanbao New Area of Loudi City, adjacent to Loudi High Speed Railway South Station. The planned scope is north of Wanbao Avenue, east of Louxing South Road, west of Xinxing South Road , and south of Jianshanzhai Mountain. The total land area is about 1200 mu, including 376 mu of residential land, 222 mu of commercial integrated land, 217 mu of road land, 38 mu of education land, 72 mu of central green axis land and 275 mu (excluding capacity) of theme park and artificial lake area. The comprehensive floor area ratio is 2.59, and the construction area of commerce accounts for 32.7%. In accordance with the development concept and thinking of "unified planning, overall development, and step-by-step implementation", the total construction period is 5 years, and main components to include residential development, commerce, office, infrastructure and supporting items.

Business and office include: over 150m high-rise landmark building, five-star hotel, high-end characteristic commercial and financial street, innovation and entrepreneurship center, talent apartment.

Infrastructure and supporting items include: high-end international primary school, kindergarten, South Loudi· Lianchuang Town Cultural Park, Yingbin Road, Longjing Road, Wolong North Road, Fengming North Road, and central landscape axis.

IV. Project Investment

The total investment is RMB 5 billion, including RMB 800 million of land costs, RMB 4.2 billion of construction, management and other costs .

V. Cooperation Way

Sole proprietorship, joint venture

VI. Benefit Analysis

Obtain a generous return through project operation, supporting services and rental income. At the same time, the financial needs of the project can be balanced through the supporting commercial and residential development within the project.

VII. Project Initiator and Contact Way

Project Initiator: Investment Promotion and Development Division of Wanbao New Area of Loudi Shuifu Demonstration Zone

Liaison: Yi Zhigao+86-0738-8116018 +86-15907384100

E-mail: wbxqzsb88@vip.163.com

Address: #B6 Baihongxuefucheng, Jin’an Street, Loudi City, Hunan Province

36、娄底体育新城项目

Loudi Sports New Town Project

一、项目建设背景

娄底以全域旅游发展为契机,积极推动东拓战略,全力打造水府庙东部新城。项目毗邻益娄衡高速出口,结合东部山水田园自然优势,配套建设全国最好的自行车骑行道、马拉松赛道,注入足球经济,带动运动健康产业,使娄底成为全国足球之城、运动之城、健康之城、旅游之城,建设成为沪昆高铁经济带重要支点城市和山水相融、宜居宜业、众人向往的现代化城市。

二、项目前期工作

已由娄底市人民政府明确开发区域和范围,区域内土地情况已调查明晰,部分土地已经报批和征收。

三、项目建设内容

项目计划分三个区域建设:

1、基础配套设施,总用地面积175亩,主要是场地的五通一平,包含土石方工程、道路工程、供配电工程、给排水工程、通信工程、燃气工程等,其中新建道路三段,共长2500米;

2、足球特色一贯制双语学校,占地面积约280亩,其中小学规模36个班级。主要建设包含足球场、教学楼、教师办公室、教工宿舍、学生宿舍、食堂、图书馆、配套用房、体育场、停车场、道路及硬化、绿化等配套设施;

3、其他配套设施,总占地面积约500亩,总建筑面积85万㎡,其中高层住宅60万㎡,低层品质住宅约20万㎡,配套商业约6万㎡。

四、项目建设投资

项目总投资约46亿元,其中工程建设费用约30亿元,工程建设其他费用(含土地费用)约12亿元,建设期利息约4亿元。

五、项目效益分析

预计投资回收期为15年,年利润约为2.5亿元。

六、项目合作模式

独资、合作。引入社会资本参与,采用合作开发或委托开发的方式进行合作,引进高质量、高水平的运营团队合作,共同运营项目区域的产业业态。

七、项目单位及联系方式

项目单位:娄底市创发集团文旅投公司

联系方式:谢宝国 15307386955

邮箱:ldwltgs@163.com

I. Project Background

Loudi takesall-for-one tourism development as an opportunity to actively promote the East Extension strategy and strive to build Shuifumiao East New Town. The project is adjacent to the exit of Yiyang-Loudi-Hengyang Expressway. Combined with the natural advantages of the landscape in the east area, the country's best bicycle riding track and marathon track were constructed and the football economy was established to drive the development of sports and health industry, making Loudi a national football city, sports city, city of health and tourism, building it into an important fulcrum city in the Shanghai-Kunming High-speed Railway Economic Belt and a modern city with mountains and waters, livable and suitable for business, and popular with people.

II. Preliminary Work

The development area and scope have been clarified by the Loudi Municipal People's Government, the land status in the area has been investigated and clarified, and some land has been submitted for approval and expropriation.

III. Project Content

The project is planned to be constructed in three areas:

1. Basic supporting facilitieswith a total land area of 175 mu: and the main component is “five accesses and site leveling”, including earthwork, road engineering, power supply and distribution engineering, water supply and drainage engineering, communication engineering, gas engineering, etc. Three sections of road with a total length of 2,500 meters are going to be built;

2. A bilingual school with consistent football characteristics, covering an area of about 280 mu, including 36 classes in primary schools. The main items to be constructed include football stadium, teaching building, teacher's office, staff quarters, student dormitory, canteen, library, supporting rooms, stadium, parking lot, road and hardening, greening and other supporting facilities;

3. Other supporting facilities: occupying a total area of about 500 mu and a total construction area of 850,000 m2, including 600,000 m2of high-rise residential building, 200,000 m2of low-rise residential building, and 60,000 m2of supporting businesses.

IV. Project Investment

The total investment of the project is about RMB 4.6 billion, including about RMB 3 billion for construction cost, about RMB 1.2 billion for other construction costs (including land costs), and about RMB 400 million for the interest during the construction period.

V. Benefit Analysis

The investment recovery period is expected to be 15 years, with an annual profit of approximately RMB 250 million.

VI. Cooperation Way

Sole proprietorship/contractual joint venture. Introduce social capital to cooperate through cooperative development or commissioned development, introduce high-quality and high-level operation team to cooperate, and jointly operate the industrial format in the project area.

VII. Project Initiator and Contact Way

Project Initiator: Loudi Venture Development Group Cultural Tourism Investment Co., Ltd.

Liaison: Xie Baoguo+86-15307386955 E-mail: ldwltgs@163.com

37、娄底水洋生态新区综合项目

Comprehensive Project of Loudi Shuiyang New Eco-Area

一、项目建设背景

水洋生态新区规划建设面积10.79平方公里,位于娄底市区东部,靠近区域生态绿核仙女寨和水府庙湖区,是娄底实施融城战略城市东扩,对接长株潭城市群的门户地区,也是生态资源富集和敏感地区。项目的开发建设是娄底城市转型与城市名片打造的空间载体,也是娄底城市东进和经济转型的战略支点。水洋生态新区的建设与发展应充分考虑生态环境和特色景观资源,既要融入城市,与城市功能相协调,又要对接区域,突出山水特色,把娄底城市建到“水”边去,形成娄底特色片区。项目按照“五大发展理念”明确建设理念,根据其功能定位、产业特征,坚持高起点规划、高质量布局,打造成一个创新之城、科技之城、活力之城。

二、项目前期工作

项目已完成环评、可研,正在编制项目实施方案。

三、项目建设内容

1、涟水南岸(江龙滩大桥至东二环+白鹭村段)综合治理,包括:河道及水体治理、沿江大道和相连支路及其附属设施建设(含机动车道、自行车道及慢行道系统)、江龙滩大桥至东二环防洪、沿江绿带及公共设施、沿江区域截污干管建设、犁头咀大桥改造,项目总占地1525亩;

2、长青街东延线综合开发建设,包括:长青街东延线(檀香路一沿江大道)道路、地下综合管廊及附属设施建设(含机动车道、自行车道及慢行道系统)、长青街跨孙水河大桥、隧道工程、相连八条支路道路及附属设施建设,项目总占地838亩;

3、娄底市第三污水处理厂新建,达到一级A排放标准,处理能力为6万吨/天;

4、水洋新区幼儿园、小学及中学建设,项目总占地225亩。

四、项目建设投资

经初步测算,项目总投资约29亿元,其中:涟水南岸(江龙滩大桥至东二环+白鹭村段)综合治理工程投资约12亿元,长青街东延线综合开发建设工程约11亿元,水洋新区污水处理厂建设工程投资约3亿元,水洋新区幼儿园、小学及中学建设工程投资约3亿元。

五、项目合作方式

独资、合作。

六、项目效益分析

项目含三个子项,其中涟水南岸综合治理工程和长青街东延线综合开发建设工程收益来源为商住用地出让收入、地下管廊收益、广告收益、停车场收费、体育设施收入、商业街区租金收入等,15年计算期内年均收入为4.2亿元;水洋新区幼儿园、小学及中学建设工程运营期20年年均收入约9800万元。项目合计年均收入5.18亿元。

七、项目单位及联系方式

项目单位:娄底市创业发展集团

联系方式:梁斌 13973800008

I. Project Background

Shuiyang New Eco-Area, with a planned construction area of 10.79 square kilometers, is located in the east of Loudi Urban Area, close to the regional ecological green core: Xiannvzhai and Shuifumiao Lake Area. It is not only a gateway area for Loudi to implement urban fusion strategy to expand eastward for for connecting the Changsha-Zhuzhou-Xiangtan City Cluster urban agglomeration, but also an eco-enriched and sensitive area. The development and construction of the project is a spatial carrier of Loudi's urban transformation and urban business cards, and also a strategic fulcrum of Loudi's eastward advancement and economic transformation. In the construction and development of the Shuiyang New Eco-Area, the ecological environment and unique landscape resources should be fully considered. It should not only integrate into the city and coordinate with the city’s function, but also connect the area, highlight the landscape features, and build Loudi City to the "water" side. The project clarifies the construction concept according to the "Five Development Concepts", adheres to the high starting point planning and high-quality layout according to its functional positioning and industrial characteristics, and creates a city of innovation, technology and vitality.

II. Preliminary Work

EIA and FSR have been completed, and the project implementation plan is being prepared.

III. Project Content

1. Comprehensive regulation of the south bank of Lianshui (Jianglongtan Bridge to the East Second Ring Road + Bailu Village), including: river channel and water body management, construction of Yanjiang Avenue and connected branch roads and their auxiliary facilities (including motor vehicle lanes, bicycle lanes and slow travel lane system), flood control from the Jianglongtan Bridge to the East Second Ring Road, green belts along the river and public facilities, construction of sewage intercepting main pipe along the river, and reconstruction of the Litouju Bridge. The total area is 1,525 mu;

2. The comprehensive development and construction of the east extension line of Changqing Street, including: the construction of the road, multi-purpose networks for underground pipelines and auxiliary facilities of the east extension line of Changqing Street (Tanxiang Road-Yanjiang Avenue) (including motor vehicle lanes, bicycle lanes and slow lane systems), bridgecrossing the Sunshui River from Changqing Street, tunnel project, eight branch roads and auxiliary facilities. The total area is 838 mu;

3. The Third Sewage Treatment Plant of Loudi City will be built to meet the Grade A A discharge standard, with a treatment capacity of 60,000 tons/day.

4. Construction of kindergarten, elementary school and middle school in Shuiyang New Area with a total area of 225 mu.

IV. Project Investment

According to preliminary estimates, the total investment of the project is about RMB 2.9 billion, of which: the investment in the comprehensive treatment project of the south bank of Lianshui (Jianglongtan Bridge to East Second Ring Road + Bailu Village) is about RMB 1.2 billion; the investment in comprehensive development and construction project of the east extension line of Changqing Street is about RMB 1.1 billion; the investment in the construction of sewage treatment plant is about RMB 300 million; and the investment in the construction of kindergarten, elementary school and middle school in Shuiyang New Area is about RMB 300 million.

V. Cooperation Way

Sole proprietorship/contractual joint venture

VI. Benefit Analysis

The project consists of three sub-projects. Among them, the income of the comprehensive treatment project of the south bank of Lianshui and the comprehensive development and construction project of the east extension line of Changqing Street is from the sale of commercial and residential land, the income from underground multi-purpose networks, advertising income, parking fees, sports facilities income, commercial street rental income, etc., and the average annual income in the 15-year calculation period is RMB 420 million; the annual average income of the construction project of kindergarten, primary school and middle school in Shuiyang New Area during the 20-year operation period is about RMB 98 million. The total annual income of the project is RMB 518 million.

VII. Project Initiator and Contact Way

Project Initiator: Loudi EntrepreneurshipDevelopmentGroup

Liaison: Liang Bin +86-13973800008

38、新邵经开区半岛城市综合体项目

Peninsula Urban Complex Project in Xinshao Economic Development Zone

一、项目建设背景

根据《邵阳市城市总体规划(修编) 2004-2020年》,明确邵阳市域形成以中心城区为主,新邵县城为辅的市城经济增长极和扩散中心。邵阳雪峰大桥建成通车,邵阳城区到新邵的60米宽雪峰路开工建设。规则建设的九头岩半岛城市综合体位于资江之滨、晒谷滩电站库区南岸,紧邻雪峰路,从邵阳城区到达项目仅需10分钟。同时,项目毗邻的湘高产业园,现有入驻企业60余家。

二、项目前期工作

已完成规划等前期工作,整个九头岩半岛已完成空间规划,配套的广益实验中学完成一期建设并开学。

三、项目建设内容

项目规划用地2600亩,容积率1.2-2.5,建筑密度不大于25%,绿地率不小于35%,建设办公楼、大型商场、酒店和休闲中心等,打造集居住、商贸、行政、文化于一体的城市综合体。

四、项目建设投资

项目投资约100亿元,包括建安工程费用、供电、供水、环保、道路与绿化基础费用、土地等无形资产费用、勘测设计、项目前期费用与建设利息等。

五、项目效益分析

预计商铺和住宅销售收入150亿元,利润30-50亿元。

六、项目合作方式

独资、合资、合作。

七、项目单位及联系方式

项目单位:新邵经济开发区管委会

联系方式:伍洞良 13975944231

邮箱:942262113@qq.com

I. Project Background

The "Urban Master Planning of Shaoyang City(Revised) 2004-2020" clearly stated that Shaoyang City should form the economic growth pole and diffusion center with the central urban area as the core, and Xinshao County as the supplement. The Shaoyang Xuefeng Bridge was completed and opened to traffic, and the construction of the 60-meter wide Xuefeng Road from Shaoyang City to Xinshao was launched. The planned Jiutouyan Peninsula Urban Complex is located on the banks of the Zijiang River and the southern bank of the Sungutan Power Station reservoir area, close to Xuefeng Road, and it takes only 10 minutes to reach the project from Shaoyang City. And the Xianggao Industrial Park adjacent to the project currently has more than 60 companies settled in it.

II. Preliminary Work

The preliminary work such as planning has been completed, the spatial planning for the entire Jiutouyan Peninsula has been completed, and the construction of Phase Iproject of Guangyi Experimental Middle School has been completed with the beginning of term.

III. Project Content

The project covers a planned area of 2600 mu with a floor area ratio of 1.2-2.5, a building density of no more than 25%, and a green space rate of no less than 35%. The office building, large shopping mall, hotel, and leisure center are going to be built to foster an urban complex integrating residence, commerce, administration and culture.

IV. Project Investment

The project investment is about RMB 10 billion, including construction and installation engineering costs, expenses for power supply, water supply, environmental protection, road and greening, land and other intangible asset costs, survey and design costs, project pre-stage costs and interest during construction period.

V. Benefit Analysis

It is estimated that the sales revenue of shops and houses will be RMB 15 billion, and the profit will be RMB 3-5 billion.

VI. Cooperation Way

Sole proprietorship/contractual joint venture/joint venture

VII. Project Initiator and Contact Way

Project Initiator: Administration Committee of Xinshao Economic Development Zone

Liaison: Wu Dongliang +86-13975944231

E-mail: 942262113@qq.com

39、怀化鹤城区城东商业综合体

Chengdong Commercial Complex of Hecheng District, Huaihua City

一、项目建设背景

项目位于城东新区行政、教育、医疗、居住核心位置,地处九丰现代农博园、五星级休闲农庄佳麓山庄和山下花海快乐谷等旅游组团中心区,区域常住人口约11万人,已形成固有大体量的居民消费市场,消费潜力巨大,目前该区域周边无一大型商业综合体,急需一个高品质的商业综合体满足该区域居民消费需求。

二、项目前期工作

已完成项目范围内集体土地上房屋的入户评估,已完成第一榜公示成果;已完成国有土地征收相关公告的发布;已完成国有土地上房屋的入户评估登记工作。

三、项目建设内容

项目位于城东组团,卢林路以东,城东连接线以南,总占地面积约346亩,净用地244亩,拟开发建设大型商业综合体及配套住宅。

四、项目建设投资

项目总投资约15亿元。

五、项目效益分析

项目建成后,将成为城东引领性商业重地,拉动当地消费能力,培植新的税源增长点,提升居民幸福指数。

六、项目合作方式

合资、合作。

七、项目单位及联系方式

项目单位:怀化市鹤城区城市建设投资有限公司

地址:怀化市鹤城区金海路152号

联系方式:刘佳灵 13762911315

邮箱:55854228@qq.com

I. Project Background

Located in the core area of administration, education, medical treatment and residence in the Chengdong New District, the project is in the central region of Jiufeng Modern Agricultural Expo Garden, Jialu Mountain Villa (a star-level leisure farm) and Sea Flower Happy Valley. The district has a resident population of about 110,000. It has formed an inherently large consumer market with huge potential for consumption. At present, there is no large-scale commercial complex around the area. A high-quality commercial complex is urgently needed to meet the consumer needs of the area.

II. Preliminary Work

The entry appraisal of houses on collective land within the scope of the project has been completed, and the first list of public achievements has been completed; the announcement of state-owned land acquisition has been released; the entry appraisal and registration of houses on state-owned land has been completed.

III. Project Content

The project is located in Chengdong Area, east of Lulin Road and south of Chengdong Link, with a total area of about 346 mu and a net land of 244 mu. It is planned to develop and construct a large-scale commercial complex and supporting residences.

IV. Project Investment

Total investment: about RMB 1.5 billion.

V. Benefit Analysis

After the project is completed, it will become a leading business center in Chengdong area. It will boost local consumption capacity, foster new tax source growth points, and improve the residents' happiness index.

VI. Cooperation Way

Contractual joint venture/joint venture

VII. Project Initiator and Contact Way

Project Initiator: Huaihua Hecheng District Urban Construction Investment Co., Ltd.

Address: No. 152 Jinhai Road, Hecheng District, Huaihua City

Liaison: Liu Jialing+86-13762911315

E-mail: 55854228@qq.com

来源:湖南商务